Sengkang LRT line
Sengkang LRT | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Native name | Laluan LRT Sengkang 盛港轻轨线 செங்காங் லைட் ரெயில் வரி | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Land Transport Authority | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Singapore | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | Sengkang | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 14 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Automated guideway transit/People mover | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Light Rail Transit (Singapore) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | 4 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | SBS Transit Ltd (ComfortDelGro Corporation) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Sengkang | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | Mitsubishi Crystal Mover (C810) Mitsubishi Crystal Mover (C810A) Mitsubishi Crystal Mover (C810D) (Future) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 27,541 (July 2020)[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 10.7 km (6.6 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Fully elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,850 mm (6 ft 27⁄32 in) Guideway span: 3.2 m (10 ft 6 in) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 750 V DC Third rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Signalling | Kyosan APM fixed block ATC under ATO GoA 4 (UTO), with subsystems of ATP, ATS and CBI[2] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Sengkang LRT is a 10.7-kilometre (6.6 mi) automated guideway transit line in Singapore. The line, which initially opened on 18 January 2003, connects the residential districts and suburbs of Sengkang to Sengkang Town Centre, where it connects with the North East MRT line, Sengkang Bus Interchange, Compass One and Compassvale Bus Interchange. It is the second line of the LRT system in Singapore and like all other LRT lines, it is fully elevated and uses automated trains. It is the first LRT line to be operated by SBS Transit.
History
[edit]Planning for the Sengkang LRT line was underway when the Bukit Panjang LRT was opened by then-Prime Minister Goh Chok Tong on 6 November 1999.[3] Construction began in January 2000 for both the East Loop and West Loop. Meanwhile, the Sengkang LRT line was awarded to Singapore Bus Service (present-day SBS Transit) on 20 May 1999.[4][5]
On 18 January 2003, the East Loop was opened, the first section of the line to do so.[6] The West Loop, with the exception of Farmway, Cheng Lim and Kupang stations, commenced operations on 29 January 2005.[7][8] These three stations then opened on 15 November 2007,[9] 1 January 2013[10] and 27 June 2015, respectively.[11]
Improvements
[edit]On 31 October 2012, the Land Transport Authority announced that starting from the first quarter of 2016, both the Sengkang and Punggol LRT systems would be upgraded to two-car trains, doubling the passenger capacity. An additional 16 cars were to be ordered, bringing the total fleet size to 57. The induction of longer trains also required modifications to the signalling and communication system.[12]
On 22 December 2015, the line began operating two-car trains, five years after plans to raise the capacity of the increasingly packed light-rail system were announced.[13]
Around the end of 2016, two-car trains started being deployed on both directions of the West Loop during the weekday peak hours, due to the increasing number of commuters living in new HDB flats located near Thanggam, Kupang and Farmway stations. Before this, two-car trains were only deployed towards the direction of Cheng Lim during morning peak hours, and towards the direction of Renjong during evening peak hours.[citation needed]
On 15 December 2017, the Land Transport Authority said there will be limited services on parts of the Sengkang-Punggol LRT (SPLRT) on most Sundays from 14 January 2018 to 25 February that year, to facilitate renewal and improvement works (except 18 February as it is a Chinese New Year holiday). Only one platform will open for service at 5.30am on Sundays. The other platform will open from 7am.[14][15][16] On 22nd of that month, SBS Transit said the arrangement is expected to continue until end April that year.[17][18]
From 27 May to 7 October that year, limited services on Sundays will continue on the Sengkang-Punggol LRT (SPLRT). One platform will open at 5.30am and the other platform will open at 5.30pm.[19][20]
On 5 February 2021, the Land Transport Authority announced that it has purchased 17 two-car trains for the Sengkang and Punggol LRT systems. The new trains will be delivered progressively from 2024 to 2027. In addition to new trains, the Sengkang Depot will also be expanded to 11.1 ha (27.4 acres) from the existing 3.5 ha (8.6 acres) to ensure there is capacity and maintenance space for the new trains. The expansion of the depot will also see two new reception tracks being built to shorten the train launching time. To ensure there is enough electricity to support the larger fleet of trains, 3 new power stations will be built, increasing the total number of power stations supporting the system to 8 once completed.[21]
Stations
[edit]Date | Project | Description |
---|---|---|
18 January 2003 | East Loop | East Loop completely opened in both directions throughout the day. |
29 January 2005 | West Loop | West Loop (except for Cheng Lim, Farmway and Kupang) opened in uni-directional manner.[7][8] |
15 November 2007 | Farmway opened for passenger service.[9] | |
4 January 2010 | West Loop operated in both directions during the morning and evening peak hours on weekdays.[22] | |
1 January 2013 | West Loop operated in both directions throughout the day and Cheng Lim was opened for passenger service.[10] | |
27 June 2015 | Kupang opened for passenger service.[11][23] |
List
Station code | Station name | Images | Interchange; Adjacent transportation |
Opening | Location(s) |
---|---|---|---|---|---|
STC NE16 | Sengkang | North East Line ― Sengkang |
18 January 2003; 22 years ago |
Sengkang | |
East Loop | |||||
SE1 | Compassvale | — | 18 January 2003; 22 years ago |
Sengkang | |
SE2 | Rumbia | ||||
SE3 | Bakau | ||||
SE4 | Kangkar | ||||
SE5 | Ranggung | ||||
West Loop | |||||
SW1 | Cheng Lim | — | 1 January 2013; 12 years ago |
Sengkang | |
SW2 | Farmway | 15 November 2007; 17 years ago | |||
SW3 | Kupang | 27 June 2015; 9 years ago | |||
SW4 | Thanggam | 29 January 2005; 20 years ago | |||
SW5 | Fernvale | ||||
SW6 | Layar | ||||
SW7 | Tongkang | ||||
SW8 | Renjong |
Services
[edit]There are four services in total, with two on each loop. However, on the Electronic Display, they will not show the service letters.
Service | Terminal | via | Loop | Direction |
A | Sengkang | Renjong | West Loop | Renjong to Cheng Lim Clockwise direction |
---|---|---|---|---|
B | Sengkang | Cheng Lim | West Loop | Cheng Lim to Renjong Anti-clockwise direction |
C | Sengkang | Compassvale | East Loop | Compassvale to Ranggung Clockwise direction |
D | Sengkang | Ranggung | East Loop | Ranggung to Compassvale Anti-clockwise direction |
Infrastructure
[edit]Rolling stock
[edit]The Sengkang and Punggol LRT lines (SPLRT) utilise the Crystal Mover Automated People Mover (APM) rolling stock manufactured by Mitsubishi Heavy Industries.[24] The rubber-tired trains are fully automatic and can accommodate up to 105 passengers per vehicle.[25][26] The SPLRT has an initial fleet of 41 APMs, with 16 more APMs delivered under contract C810A.[27][28] The APMs are configured for single car or two-car operations,[27] with a maximum capacity of 36 trainsets on the network.[29] In February 2022, the LTA ordered another fleet of 17 two-car APMs from Mitsubishi for S$439 million.[30][31] This was followed by another order for eight more two-car trains in May 2023, costing S$87 million.[32][33] The new trains are set to replace the 25 one-car trains and half of the 16 two-car trains, bringing the overall SPLRT fleet to 33 two-car APMs.[32]
The APMs have a top speed of 80 km/h (50 mph), with a maximum operational speed of 70 km/h (43 mph).[25] They are powered by 750V DC third rail located on one side of the guideway.[34] Each vehicle is 11.84 m (38.8 ft) long and 2.69 m (8.8 ft) wide.[25] The exterior has a crystal-like design with a polyhedral nose reflective of its namesake. Mitsubishi describes the curved sides of the APM as a design choice to "soften" the sharpness of its polyhedral shape. The exterior is painted pearl white and indigo blue.[35]
As driverless vehicles, the APMs do not include a driver cabin. The emergency stop button and emergency notice system are located at the right-side corner of the vehicle's front, while line maps and service information are displayed on the left. The interior features white side panels and ceiling, a grey floor, grayish-blue seats, and handrails and grip bars accented in a wine color.[35] The cabins are air-conditioned.[36]
The SPLRT trains are maintained and stabled on the second floor of Sengkang Depot.[34] Located between the Layar and Tongkang LRT stations,[37] the depot also houses the trains of the North East line.[30] Its facilitates include a two-story main building with an operation control center room, automatic vehicle washing facility, maintenance garage, departure inspection track, stabling yard, power receiving and transforming facilities, and a test track.[34] The 3.5-hectare (8.6-acre) site is being expanded to 11.1 hectares (27 acres), which will include two more reception tracks and three traction power substations to expand the depot's stabling and maintenance capacity.[30][38]
Train control
[edit]The Sengkang LRT line is fully automatic,[26] and is equipped with Kyosan APM fixed block signalling system.[39]. The line's Automatic train control (ATC) is composed of automatic train protection (ATP) which ensure safe operations, automatic train operation (ATO) which controls the automatic operations, and automatic train supervision (ATS) for overall command, monitoring and recording of the system.[25] To reduce equipment mass, the ATP and ATO systems on the train are integrated into one unit, althought for safety reasons, the function and control logic of the AVP and AVO systems remain independent.[40] These subsystems are connected via LAN and managed by a computer-based interlocking (CBI) system that oversees traffic safety of the APM.[41][42]
Incidents
[edit]- On 20 April 2015, the East Loop suffered a brief service disruption due to a power fault.[43]
- On 8 May 2015, more than two weeks after the April 2015 disruption, another service disruption occurred on the West Loop, stranding a number of trains for three hours at 5.00 pm.[44]
- On 16 February 2018, the first day of Chinese New Year, a train broke down near Sengkang station from the West Loop due to a dislodged power collector shoe at 11.09 am. A rescue train managed to haul the faulty train away and services were resumed approximately two hours later.[45]
- On 9 June 2024, a signalling fault on the Sengkang LRT and Punggol LRT lines caused services to be suspended from the first trains around 5.45 am until 10.12 am.[46]
Gallery
[edit]References
[edit]Citations
[edit]- ^ "Land Transport DataMall". mytransport.sg. Archived from the original on 21 August 2020. Retrieved 20 August 2020.
- ^ "Kyosan Corporate Report 2018". 2018. p. 19 to 20. Archived from the original on 16 June 2020. Retrieved 16 June 2020.
- ^ "Speech By Mr Mah Bow Tan Minister For Communications At The Sengkang LRT Exhibition At Ngee Ann City" (PDF). NAS. Archived (PDF) from the original on 1 October 2020.
- ^ "Appointment of operator for the North East MRT line". NAS. 20 May 1999. Archived from the original on 23 November 2019. Retrieved 22 November 2019.
- ^ "SBS to run North-East line Tibs to merge with SMRT". The Straits Times (retrieved from NLB). 21 May 1999. Archived from the original on 6 October 2019. Retrieved 6 October 2019.
- ^ "Free LRT service in Sengkang". Today (retrieved from NLB). 17 January 2003. Archived from the original on 8 July 2019. Retrieved 13 October 2019.
- ^ a b "Punggol LRT and Sengkang LRT West Loop to Commence Revenue Service on 29 January 2005". SBS Transit. 10 January 2005. Archived from the original on 30 August 2019. Retrieved 30 August 2019.
- ^ a b "Punggol LRT (East Loop) And Sengkang LRT (West Loop) Commence Revenue Service Today". SBS Transit. 29 January 2005. Archived from the original on 11 February 2013. Retrieved 29 June 2014.
- ^ a b "Farmway LRT Station to open on 15 November 2007". SBS Transit. 14 November 2007. Archived from the original on 7 September 2017. Retrieved 7 September 2017.
- ^ a b "Cheng Lim LRT station To Open And Sengkang West LRT to Run in Both Directions". SBS Transit. 21 December 2012. Archived from the original on 24 December 2012. Retrieved 21 December 2012.
- ^ a b "Kupang LRT station to open on Saturday, 27 June 2015" (PDF). SBS Transit. 15 June 2015. Archived from the original (PDF) on 24 November 2015. Retrieved 15 June 2015.
- ^ "2-car System for Sengkang Punggol LRT by 2016; Improvements to Choa Chu Kang LRT station". Land Transport Authority. 31 October 2012. Archived from the original on 22 October 2013. Retrieved 12 October 2013.
- ^ Tan, Christopher (24 December 2015). "2-car trains roll out on Sengkang LRT". The Straits Times. Archived from the original on 28 October 2017. Retrieved 28 October 2017.
- ^ "Limited service along Sengkang-Punggol LRT on Sundays in Jan, Feb to facilitate rail works". CNA. Archived from the original on 16 December 2017. Retrieved 17 December 2017.
- ^ "Limited Sengkang-Punggol LRT services on Sunday mornings from 14 Jan". Archived from the original on 21 December 2017. Retrieved 17 December 2017.
- ^ "Limited service on Sundays for Sengkang-Punggol LRT". The Straits Times. 16 December 2017. Archived from the original on 18 December 2017. Retrieved 17 December 2017.
- ^ "Maintenance work to resume on Sengkang and Punggol LRT systems on 4 Mar". CNA. Archived from the original on 23 February 2018. Retrieved 23 February 2018.
- ^ Hussain, Amir (22 February 2018). "Maintenance works to resume on Sengkang and Punggol LRT systems". The Straits Times. Archived from the original on 23 February 2018. Retrieved 23 February 2018.
- ^ Lam, Lydia (11 May 2018). "SBS Transit extends limited service on Sundays for Sengkang, Punggol LRT to October". The Straits Times. Archived from the original on 14 May 2018. Retrieved 14 May 2018.
- ^ "Limited service hours on Sundays for Sengkang-Punggol LRT to be extended". Archived from the original on 15 May 2018. Retrieved 14 May 2018.
- ^ "Sengkang-Punggol LRT to get 17 new two-car trains to boost capacity". CNA. 5 February 2021. Archived from the original on 15 May 2021. Retrieved 6 February 2021.
- ^ "SK West Loop Peak Hours" (PDF). SBS Transit. 16 December 2009. Archived from the original (PDF) on 19 February 2016. Retrieved 30 August 2019.
- ^ "Sengkang LRT fully operational by June 27 when Kupang station opens". The Straits Times. 15 June 2015. Retrieved 18 January 2025.
- ^ Mochidome & Masukawa 2003, p. 1.
- ^ a b c d Mochidome & Masukawa 2003, p. 2.
- ^ a b "LRT – Your Link to the MRT". Land Transport Authority. Archived from the original on 14 June 2004. Retrieved 18 January 2025.
- ^ a b "Mitsubishi Heavy Industries and Mitsubishi Corporation Receive Order for Design, Manufacture, Installation and Commissioning of Singapore Light Rapid Transit Capacity Expansion – Vehicles and Electrical and Mechanical Systems for Sengkang and Punggol LRT Systems (C810A)". Mitsubishi Heavy Industries. 22 May 2013. Archived from the original on 4 March 2016. Retrieved 25 November 2015.
- ^ Tan, Christopher (24 December 2015). "2-car trains roll out on Sengkang LRT". The Straits Times. Retrieved 18 January 2025.
- ^ Tan, Christopher (9 September 2016). "Hairline cracks found on 11 Sengkang-Punggol LRT trains". The Straits Times. Retrieved 18 January 2025.
- ^ a b c "LTA Awards Contracts for New Trains and Depot Expansion for Sengkang-Punggol LRT". LTA. 15 February 2022. Retrieved 18 January 2025.
- ^ "MHIENG Receives Order for Project to Enhance Capacity of Sengkang-Punggol Light Rapid Transit System in Singapore – Strengthening the Safe and Smooth Transport Structure in the Sengkang and Punggol Districts". Mitsubishi Heavy Industries. 17 February 2022. Retrieved 18 January 2025.
- ^ a b "8 new two-carriage trains to be added to Sengkang-Punggol LRT line". The Straits Times. 9 May 2023. Retrieved 18 January 2025.
- ^ "MHI Receives Follow-up Order for 8 Two-Car Trains for Sengkang-Punggol LRT (SPLRT) – Additional 16 Cars to Boost Capacity of SPLRT Serving Sengkang and Punggol Districts". Mitsubishi Heavy Industries, Ltd. 9 May 2023. Retrieved 18 January 2025.
- ^ a b c Mochidome & Masukawa 2003, p. 9.
- ^ a b Mochidome & Masukawa 2003, p. 3.
- ^ Mochidome & Masukawa 2003, p. 8.
- ^ "Annex A: Location Map and Artist" (PDF). Land Transport Authority. Retrieved 18 January 2025.
- ^ Lee, Nian Tjoe (15 February 2022). "LTA awards $596m contracts for trains and depot expansion on Sengkang-Punggol LRT system". The Straits Times. Retrieved 18 January 2025.
- ^ Kyosan Electric n.d., pp. 4, 11.
- ^ Mochidome & Masukawa 2003, p. 6.
- ^ Kyosan Electric n.d., p. 4.
- ^ "全体システム構成図" (in Japanese). Kyosan Electric. Archived from the original on 14 August 2004. Retrieved 18 January 2025.
- ^ migration (20 April 2015). "Sengkang LRT East Loop train service stopped briefly". The Straits Times. Archived from the original on 25 August 2019. Retrieved 25 August 2019.
- ^ "Sengkang LRT trains stuck on tracks due to power fault". The Online Citizen. 9 May 2015. Archived from the original on 25 August 2019. Retrieved 25 August 2019.
- ^ hermesauto (16 February 2018). "Sengkang LRT train breaks down on first day of CNY, passengers get down and walk on tracks". The Straits Times. Archived from the original on 25 August 2019. Retrieved 25 August 2019.
- ^ "Punggol-Sengkang LRT service resumes after 4-hour disruption on Sunday morning". The Straits Times. 9 June 2024. Retrieved 9 June 2024.
Sources
[edit]- APM Signaling System (PDF) (Report). Japan: Kyosan Electric. n.d. Retrieved 18 January 2025.
- Mochidome, Hiroyuki; Masukawa, Masahisa (June 2003). Automated People Mover System "Crystal Mover" for Singapore's LTA (PDF) (Report). Japan: Mitsubishi Heavy Industries. Retrieved 18 January 2025.
{{cite report}}
: CS1 maint: ref duplicates default (link)